Home › In your area › Postcode district › HU19
Feed-in tariff solar in HU19
126 installations in the HU19 postcode district are accredited under the Feed-in Tariff, holding 2,572 kW between them. That is an average system size of 20.41 kW, and ranks the district 1919 of 2645.
126installations
2,572 kWinstalled capacity
20.41 kWaverage system
2015busiest year
What is installed
| Technology | Installations |
|---|---|
| Photovoltaic | 123 |
| Wind | 3 |
Where this sits
East Riding of Yorkshire7,068 installations Beverley and Holderness2,043 installations All districts2,645 with five or more
A postcode district is the outward half of a postcode, which is as precise as the public register goes. Districts with fewer than five installations are not published here.
Ofgem register as at 2025-12-31 Download all districts (CSV)