Home › In your area › Postcode district › HR8
Feed-in tariff solar in HR8
476 installations in the HR8 postcode district are accredited under the Feed-in Tariff, holding 4,597 kW between them. That is an average system size of 9.66 kW, and ranks the district 611 of 2645.
476installations
4,597 kWinstalled capacity
9.66 kWaverage system
2011busiest year
What is installed
| Technology | Installations |
|---|---|
| Photovoltaic | 475 |
| Wind | 1 |
Where this sits
Herefordshire- County of5,135 installations North Herefordshire3,047 installations All districts2,645 with five or more
A postcode district is the outward half of a postcode, which is as precise as the public register goes. Districts with fewer than five installations are not published here.
Ofgem register as at 2025-12-31 Download all districts (CSV)