5 rates, from 16.78p to 16.78p per kWh. These are the current values for 2026-27, after the CPI adjustment of 3.4 per cent.

NaN undefined N/A to NaN undefined N/A

TechnologyTypeEfficiency band Capacity kWp/kWh
Anaerobic digestion 0 – 5000 16.78
Hydro 0 – 5000 16.78
Micro CHP 0 – 5000 16.78
Photovoltaic 0 – 5000 16.78
Wind 0 – 5000 16.78

The efficiency band applies to solar from April 2012 and makes a large difference: on the same system it can be the gap between the higher and lower rate. It is on your FIT statement. The rate finder will ask for it when it matters.

Ofgem tariff table, published 23 March 2026 Download every rate (CSV)