Home › In your area › Postcode district › NE2
Feed-in tariff solar in NE2
87 installations in the NE2 postcode district are accredited under the Feed-in Tariff, holding 469 kW between them. That is an average system size of 5.39 kW, and ranks the district 2162 of 2645.
87installations
469 kWinstalled capacity
5.39 kWaverage system
2011busiest year
What is installed
| Technology | Installations |
|---|---|
| Photovoltaic | 87 |
Where this sits
Newcastle upon Tyne2,944 installations Newcastle upon Tyne East574 installations All districts2,645 with five or more
A postcode district is the outward half of a postcode, which is as precise as the public register goes. Districts with fewer than five installations are not published here.
Ofgem register as at 2025-12-31 Download all districts (CSV)