Home › In your area › Postcode district › ME8
Feed-in tariff solar in ME8
400 installations in the ME8 postcode district are accredited under the Feed-in Tariff, holding 1,869 kW between them. That is an average system size of 4.67 kW, and ranks the district 794 of 2645.
400installations
1,869 kWinstalled capacity
4.67 kWaverage system
2014busiest year
What is installed
| Technology | Installations |
|---|---|
| Photovoltaic | 400 |
Where this sits
Medway2,021 installations Gillingham and Rainham635 installations All districts2,645 with five or more
A postcode district is the outward half of a postcode, which is as precise as the public register goes. Districts with fewer than five installations are not published here.
Ofgem register as at 2025-12-31 Download all districts (CSV)