ownergy

Home › In your areaPostcode district › LE19

Feed-in tariff solar in LE19

199 installations in the LE19 postcode district are accredited under the Feed-in Tariff, holding 3,240 kW between them. That is an average system size of 16.28 kW, and ranks the district 1563 of 2645.

199installations
3,240 kWinstalled capacity
16.28 kWaverage system
2012busiest year
0 20 39 10 11 12 13 14 15 16 17 18 19 20
Installations commissioned in LE19 by year. Ofgem Feed-in Tariff register, 2025-12-31.

What is installed

TechnologyInstallations
Photovoltaic197
Wind2

Where this sits

Blaby1,372 installations South Leicestershire1,617 installations All districts2,645 with five or more

A postcode district is the outward half of a postcode, which is as precise as the public register goes. Districts with fewer than five installations are not published here.

Ofgem register as at 2025-12-31 Download all districts (CSV)